With the entry into force of the new Building Modernisation Act (GModG), the statutory framework for thermal systems is undergoing fundamental change. Since 29 July 2026, the previous requirement stipulating that newly installed heating systems must incorporate a share of at least 65 per cent renewable energy is obsolete. In its place, a mandatory phased plan, the so-called bio-staircase, applies to new gas and oil heating systems.
This pathway requires corresponding systems to be operated partially with climate-neutral fuels from 2029 onwards. The mandated minimum share starts at 10 per cent and rises incrementally to 60 per cent by 2040. For property owners, however, an essential alternative exists between 2029 and 2034: the statutory requirements can be met in full provided that a ventilation system with a high heat recovery rate is installed that serves the entire building.
Significance for Efficiency House standards and compliance documentation
Ventilation systems with heat recovery occupy a central position in modern energy concepts. Uwe Schumann, Head of Association Relations and Knowledge Management at Pluggit, highlights that such systems not only significantly reduce ventilation heat losses, but also ensure structural moisture protection. In the calculation procedures taking effect from 2027 based on the revised DIN/TS 18599-6:2025-10, the energy assessment of buildings will improve further through the use of these systems.
For refurbishment projects aiming for an Efficiency House 40 standard, the installation of controlled domestic ventilation will become a mandatory requirement in the future. For all other Efficiency House classes, planners and consultants are also required to provide and explain in detail to the client at least one comparative calculation that takes heat recovery into account.
Eligible components and tax relief
The installation of such equipment is supported by the state across several pillars. The Federal Office for Economic Affairs and Export Control (BAFA) grants a 15 per cent subsidy as an individual measure under the Federal Funding for Efficient Buildings (BEG), which increases to 20 per cent if an individual refurbishment roadmap (iSFP) is in place. In addition, subsidised loans from the Kreditanstalt für Wiederaufbau (KfW) of up to 120,000 EUR per residential unit are available. Alternatively, tax deductibility applies via the annual income tax adjustment under Section 35c of the Income Tax Act, allowing 20 per cent of expenses to be claimed based on a specialist contractor declaration.
- —Heat recovery efficiency of at least 80 per cent with a specific electrical power consumption of no more than 0.45 W/(m³/h)
- —Alternative heat recovery efficiency of at least 75 per cent at a maximum of 0.35 W/(m³/h)
- —Professional design and precise commissioning in accordance with DIN 1946-6
- —Full subsidy eligibility for the current portfolio of centralised and decentralised units from manufacturer Pluggit