In the Stuttgart district of Münster, the housing cooperative Baugenossenschaft Münster am Neckar eG, the state capital Stuttgart, and Internationale Bauausstellung 2027 StadtRegion Stuttgart GmbH (IBA’27) celebrated the topping-out ceremony for the 'Haus am Park' building. The new build marks the first completed construction phase of the overarching development project 'Zukunft Münster 2050' in the Moselstraße neighbourhood.
The structural shell, which has now been completed, comprises 67 flats built using sustainable timber-hybrid construction. The architectural concept provides for varied floor plans and flat types to accommodate different lifestyles. Structural transitions to the adjacent park are planned on the ground floor. For heating, the cooperative designed a climate-friendly energy solution in partnership with Stadtwerke Stuttgart. The completion of the building and move-in by the first tenants are scheduled for 2027.
Phased neighbourhood regeneration across 1.5 hectares
The Moselstraße neighbourhood covers an area of around 1.5 hectares between Freibergstraße, Elbestraße, and Wupperstraße. As part of the overall development, 170 existing flats are to be replaced step by step with around 230 modern residential units, which will provide housing for approximately 550 people in the future. The phased implementation gives existing residents the opportunity to remain in their familiar surroundings during construction and move directly within the neighbourhood.
More than 100 guests from the regional construction and housing sector attended the ceremony, alongside representatives of the state capital, the state of Baden-Württemberg, the Verband Region Stuttgart, and the international IBA’27 board of trustees. Theresa Schopper, Minister for Regional Development and Housing of the State of Baden-Württemberg, highlighted that the project links affordable, climate-friendly, and community-oriented living, placing people at the heart of the renewal. Stuttgart's First Deputy Mayor, Dr Fabian Mayer, emphasised that convincing architectural solutions to both social and ecological questions had been found at Moselstraße.
Andreas Hofer, Artistic Director and Managing Director of IBA’27, noted that a previously nondescript neighbourhood street is being transformed into a public place through amenities such as workshops, childcare, and intergenerational housing. Michael J. Rosenberg-Pohl, Chairman of the Executive Board of Genossenschaft Münster am Neckar, reaffirmed the cooperative's commitment to reliability, affordable living space, and social cohesion across generations.
- —Project: Haus am Park as the prelude to 'Zukunft Münster 2050'
- —Scope: 67 timber-hybrid flats in the first construction phase, approx. 230 units upon final completion
- —Site: Around 1.5 hectares in the Moselstraße neighbourhood for a future 550 residents
- —Schedule: Planned completion of the first phase in 2027














