On the site at Thulestraße 48 in the southern Berlin district of Pankow, directly adjacent to Prenzlauer Berg, construction of the Thule48 residential building has commenced. Acting on behalf of the client, UBM Development AG, PORR Hochbau Region Ost is serving as general contractor for the project. The joint foundation stone laying ceremony by the client, planners and executing contractors in early October 2026 marked the official start of structural construction works.
The project encompasses the turnkey construction of a total of 78 residential units, with completion scheduled for 2028. The two- to four-room flats offer floor plans ranging from 44 to 106 square metres. The construction programme will now see the building rise steadily storey by storey.
Sustainable energy concept and DGNB Gold certification
A central element of the design is the building's energy profile. Gold certification under the standard of the German Sustainable Building Council (DGNB) is targeted for the new-build scheme. The underlying design accounts for the conscious selection of materials, the demountability of the structure and a forward-looking energy supply. Photovoltaic systems will be installed on the roofs to generate part of the building's internal electricity demand directly on site.
Speaking at the ceremony, Andreas Kimling, Regional Head of Structural Engineering East at PORR, emphasised that the symbolic act marked the transition from the intensive planning phase to actual construction. He noted that the physical structure is now gradually emerging from the preceding drawings and calculations, delivered in close partnership.
Communal areas and mobility infrastructure
Complementing private living spaces, Thule48 includes a diverse range of usable communal areas as well as contemporary infrastructure for local mobility:
- —Communal roof garden with integrated seating areas, horticultural planting and a dedicated play area
- —A total of 151 designated bicycle parking spaces to support environmentally friendly transport
- —Secure indoor bicycle garage with 143 spaces inside the building
- —Eight dedicated outdoor spaces for cargo bikes
With the scheduled delivery of the project, new housing will be created by 2028 at the junction of Pankow and Prenzlauer Berg, realised in line with binding standards for sustainable building and contemporary urban living.














