Semiconductor company Silicon Box has initiated the basic design phase for its planned plant in Novara, northern Italy. In this project stage, the essential technical and structural parameters for the further delivery of the major project will be definitively established. The total investment volume stands at EUR 3.2 billion. For the Singapore-based company, the project represents its first manufacturing expansion outside its home market and the creation of the first facility of its kind across Europe.
The future industrial complex is intended to provide advanced capabilities for semiconductor assembly and testing. Based on advanced panel-level packaging, chiplets of various dimensions and from different manufacturers can be integrated and tested on a single platform. The objective is to sustainably strengthen the resilience of European semiconductor supply chains.
Integrated planning by Stantec and Drees & Sommer
In 2025, Silicon Box appointed planning and consultancy firms Stantec and Drees & Sommer to provide multidisciplinary engineering and architectural services. Stantec is managing overall project coordination, infrastructure, water and energy planning, permitting management, and the architectural design of the main and office building, including the surrounding grounds. Drees & Sommer is responsible for the integrated planning of the production and utility buildings, combining structural engineering, building services, and specialised cleanroom concepts.
Emanuela Sturniolo, Operations Director at Stantec in Italy, emphasised that the transition into basic design represents a pivotal step in providing technological momentum and building new industrial capabilities in Italy. Silvia Turtschan, Associate Partner at Drees & Sommer, highlighted that the design of the complex cleanroom and manufacturing facilities must be configured for maximum flexibility in order to keep pace with the rapid innovation cycles of the semiconductor sector.
Infrastructure, landscape integration, and delivery schedule
The site covers an area of roughly 60 hectares in the province of Novara. Transport connections include the newly built Agognate railway station, which connects the site to the city centre in just a few minutes. The landscape planning specifications include measures to promote biodiversity, sustainable rainwater management, and targeted limits on soil sealing. The architectural concept for the main building brings together research and administrative areas with design elements inspired by the Piedmontese surroundings.
According to Jae Hak Yee, Chief Operating Officer of Silicon Box, operational insights from the existing facility in Singapore are directly informing the detailed design for Novara. The project partners are working towards a start of construction in 2027 to precisely prepare production workflows, ultra-pure media supply, and building services for future operations.
- —Investment volume: EUR 3.2 billion
- —Site area: approximately 60 hectares in the province of Novara (Piedmont)
- —Planned start of construction: 2027
- —General planners involved: Stantec and Drees & Sommer














