ARE Austrian Real Estate has completed the development of the 'Im Grünen Mödling' neighbourhood in the Neusiedlerviertel district. The project was created in close coordination with the municipality of Mödling on the site of the former Gendarmerie central school. With the completion of the residential complex at Fliegenspitz, the overall project reached its conclusion following a ten-year development and construction period, which began with the demolition of the old buildings.
Gerald Beck, Managing Director of ARE, highlighted the significance of this milestone for the company. He noted that a mixed-use quarter had been created on the former school grounds, combining housing types ranging from terraced houses to assisted living facilities with local amenities, medical infrastructure and public open spaces. This, he stated, had created long-term added value for the residents and the municipality of Mödling.
Residential complex at Fliegenspitz completes the neighbourhood
As the final of four development phases, the residential complex at Fliegenspitz was handed over following a two-year construction period. Designed by MBM Architektur, the scheme comprises ten residential buildings with up to four storeys above ground, embedded in car-free landscaped grounds. The ensemble provides 116 residential units with one to five rooms and living spaces ranging from 31 to 129 square metres, as well as two medical practice premises.
All units feature private outdoor areas in the form of balconies, terraces or private gardens. The communal outdoor spaces offer seating areas as well as several playgrounds for children. The location benefits from short walking distances, with Mödling town centre and the Vienna Woods each around a 15-minute walk away.
Solid construction and renewable energy supply
The low-energy buildings were constructed using solid brickwork combined with reinforced concrete. Around 75,000 insulated bricks were used for the above-ground external walls, while the basement level, including the underground car park, storage rooms and load-bearing partition walls, is made of reinforced concrete. Heat is supplied via geothermal energy using heat pumps combined with district heating. Thermally activated building components integrated into the concrete ceilings heat the rooms in winter and provide moderate cooling in the summer months. Photovoltaic systems on the green roofs generate electricity for communal areas and heat pumps.
- —Total capacity of 234 apartments across terraced houses, assisted living units, urban villas and multi-storey apartment blocks
- —Integration of a local convenience store, medical practice premises, catering facilities and space for two subsidised housing projects
- —Realisation of a public quarter square at Fliegenspitz and a future park on the corner of Quellenstraße and Grutschgasse














